Project: New York metro line construction

In-depth analysis

> Results

Faster delivery and no custom barriers due to the local supply
Full compliance with the specifications required by the customer

> Application

Tunnel Boring Machine (TBM) of the metropolitan tunnel of the city

> Target

To supply products in compliance with American UL-CSA Standards, in a short time: within one month from the order confirmation

> Solutions

Discover more projects

Switch The Language

    Enter your email
    and discover the software

    Cables_Store-3.png

    Leave your email and log in to the Cables Store

    Leave your email
    and go to Solvtek

    Select Your Geographic Zone

    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.